Washington, DC heat pump rebates

Every DC rebate for your home. One page. Checked Oct 24, 2026. Deadlines counted down to the day. No sales pitch.

Find my rebates in 60 seconds See the deadlines

DC deadlines

Nearest deadline first. Day counts update every time the page loads. Checked Oct 24, 2026.

  1. Dec 31, 2026

    Ending DC BEPS Cycle 1 ends

    The first compliance cycle of the DC Building Energy Performance Standards ends Dec 31, 2026. Date: Dec 31, 2026.

    Source: DC Department of Energy and Environment, BEPS. Checked Oct 24, 2026.

  2. Ended

    Ended Federal heat pump tax credits (25C and 25D)

    The federal 25C and 25D credits ended Dec 31, 2025. They are not available for a 2026 install.

    Source: IRS, Energy Efficient Home Improvement Credit (25C); IRS, Residential Clean Energy Credit (25D). Checked Oct 24, 2026.

How DC rebates work

DC homes do not go through a utility rebate program the way Maryland homes do. Heat pump rebates in the District run through the DC Sustainable Energy Utility (DCSEU). Income-qualified households can also get electrification at no cost through the Affordable Home Electrification Program (AHEP).

DCSEU heat pump rebates

Up to $5,000 DCSEU rebate for switching from gas to a heat pump, Most Efficient tier

Source: DC Sustainable Energy Utility (DCSEU), residential rebates. Checked Oct 24, 2026.

$750 to $1,600 DCSEU heat pump water heater rebate

Source: DC Sustainable Energy Utility (DCSEU), residential rebates. Checked Oct 24, 2026.

$2,000 DCSEU electrical panel heavy-up rebate

Source: DC Sustainable Energy Utility (DCSEU), residential rebates. Checked Oct 24, 2026.

A heat pump often needs more electrical capacity than a gas furnace did. Ask your installer whether your panel needs a heavy-up before you sign, because that rebate is separate from the equipment rebate.

Apply with DCSEU

AHEP: no-cost electrification for qualifying households

No cost Affordable Home Electrification Program, for qualifying households

Source: DCSEU, Affordable Home Electrification Program (AHEP). Checked Oct 24, 2026.

AHEP is income-qualified. If your household qualifies, start there before paying for any equipment, then use DCSEU rebates for anything AHEP does not cover.

Check AHEP eligibility

Federal tax credits ended Dec 31, 2025

The federal 25C and 25D credits ended Dec 31, 2025. They are not available for a heat pump installed in 2026. DC money for a 2026 install comes from DCSEU and AHEP.

Ended Dec 31, 2025 Federal 25C and 25D credits

Source: IRS, Energy Efficient Home Improvement Credit (25C); IRS, Residential Clean Energy Credit (25D). Checked Oct 24, 2026.

Fix the house first. Then size the heat pump.

Most bad heat pump installs skip the first three steps and sell the biggest unit that fits the slab. The house stays leaky, the oversized unit short-cycles, rooms stay uneven and the bill stays high. Follow the order and the heat pump can be smaller, cheaper and quieter, and in DC the largest rebates are built around this same order.

  1. Measure: blower door test and energy audit

    A fan sealed into the front door measures how much air the house leaks. The audit also checks insulation, ducts and equipment. No blower door test, no baseline. No baseline, no honest quote.

  2. Seal: air sealing

    Seal what the test found: attic hatches, plumbing and wiring holes, duct joints, rim joists. Seal before you insulate, because insulation does not stop moving air.

  3. Insulate

    With the leaks closed, top up attic and wall insulation. The envelope sets the load the heat pump has to meet.

  4. Size, then install: Manual J

    Only now can a Manual J load calculation say how much heating and cooling each room needs. Size to the measured house, not to the old furnace's nameplate.

Want the long version? Read why air sealing comes before insulation and how a Manual J load calculation sizes a heat pump.

DC BEPS: Cycle 1 ends Dec 31, 2026

The DC Building Energy Performance Standards apply to large buildings, not single-family homes. Owners and managers of covered buildings must meet the standard for their building type each cycle or complete the energy actions DOEE accepts.

Dec 31, 2026 DC BEPS Cycle 1 ends

Source: DC Department of Energy and Environment, BEPS. Checked Oct 24, 2026.

Read the DOEE BEPS rules